ORD-4210 · Kiewit

ORD-4210ActiveNot invoiced
Customer: KiewitCreated Jun 30, 2026 by Jordan Reyes

Commercial summary

Order terms
Service
Material haul
Material
Topsoil
Est. quantity
260 tons
Window
Jul 4Jul 18
Rate
$15.00 per ton
Order value
$3,900.00
Billing
Net 30 · per job
PO number
PO-77010
Billing contact
Pricing breakdown
Topsoil (260 tons × $15.00)$3,900.00
Total$3,900.00

Operational details

Route
Pickup
Geneva Rock pit, Point of the Mountain
40 mi one-way
Drop-off
Saratoga Springs subdivision, lot 22
Route preview
ComplianceSee Compliance tab
0
Blockers
0
Expiring
4
OK
Materials manifest filed with UDEQDOT pre-trip on file
Resources
Trucks
4
Loads/truck/day
6
Truck type
Side dump (40-ton)
Trailer
Belly-dump
Site contact
Primary location
Saratoga Springs subdivision, lot 22
Sara Beltran
On-site contact
(385) 555-0207
Special instructions

No special instructions.

Material handling

Material is wet — load light to stay under 80,000 lb gross.

Site access

Enter from south gate only. Gate code 4827.

Customer requirements
  • Preferred drivers: Marcus Hale, Diego Ramos
  • Driver must wear Class 2 vest and hardhat at all times