ORD-4210 · Kiewit
ORD-4210ActiveNot invoiced
Customer: KiewitCreated Jun 30, 2026 by Jordan Reyes
Commercial summary
Order terms
Service
Material haul
Material
Topsoil
Est. quantity
260 tons
Window
Jul 4 – Jul 18
Rate
$15.00 per ton
Order value
$3,900.00
Billing
Net 30 · per job
PO number
PO-77010
Billing contact
—
Pricing breakdown
| Topsoil (260 tons × $15.00) | $3,900.00 |
| Total | $3,900.00 |
Operational details
Route
Pickup
Geneva Rock pit, Point of the Mountain
40 mi one-way
Drop-off
Saratoga Springs subdivision, lot 22
Route preview
ComplianceSee Compliance tab
0
Blockers
0
Expiring
4
OK
Materials manifest filed with UDEQDOT pre-trip on file
Resources
Trucks
4
Loads/truck/day
6
Truck type
Side dump (40-ton)
Trailer
Belly-dump
Site contact
Primary location
Saratoga Springs subdivision, lot 22
Sara Beltran
On-site contact
Special instructions
No special instructions.
Material handling
Material is wet — load light to stay under 80,000 lb gross.
Site access
Enter from south gate only. Gate code 4827.
Customer requirements
- Preferred drivers: Marcus Hale, Diego Ramos
- Driver must wear Class 2 vest and hardhat at all times