ORD-4225 · Wadsworth Bros
ORD-4225ActiveNot invoiced
Customer: Wadsworth BrosCreated Jun 15, 2026 by Jordan Reyes
Commercial summary
Order terms
Service
Material haul
Material
Sand
Est. quantity
9 loads
Window
Jun 18 – Jul 3
Rate
$260.00 per load
Order value
$2,340.00
Billing
Net 30 · per job
PO number
—
Billing contact
—
Pricing breakdown
| Sand (9 loads × $260.00) | $2,340.00 |
| Total | $2,340.00 |
Operational details
Route
Pickup
Geneva Rock pit, Point of the Mountain
31 mi one-way
Drop-off
Daybreak phase 4, South Jordan
Route preview
ComplianceSee Compliance tab
0
Blockers
0
Expiring
4
OK
Materials manifest filed with UDEQDOT pre-trip on file
Resources
Trucks
3
Loads/truck/day
5
Truck type
Side dump (40-ton)
Trailer
End-dump
Site contact
Primary location
Daybreak phase 4, South Jordan
Mike Donnelly
On-site contact
Special instructions
No special instructions.
Material handling
Material is wet — load light to stay under 80,000 lb gross.
Site access
Enter from south gate only. Gate code 4827.
Customer requirements
- Preferred drivers: Marcus Hale, Diego Ramos
- Driver must wear Class 2 vest and hardhat at all times