ORD-4231 · Whitaker Excavation
ORD-4231CancelledNot invoiced
Customer: Whitaker ExcavationCreated Jun 21, 2026 by Jordan Reyes
Commercial summary
Order terms
Service
Material haul
Material
Topsoil
Est. quantity
206 tons
Window
Jun 26 – Jul 3
Rate
$15.00 per ton
Order value
$3,090.00
Billing
Net 30 · per job
PO number
—
Billing contact
—
Pricing breakdown
| Topsoil (206 tons × $15.00) | $3,090.00 |
| Total | $3,090.00 |
Operational details
Route
Pickup
Staker Parson pit, Beck Street
35 mi one-way
Drop-off
Saratoga Springs subdivision, lot 22
Route preview
ComplianceSee Compliance tab
0
Blockers
0
Expiring
4
OK
Materials manifest filed with UDEQDOT pre-trip on file
Resources
Trucks
5
Loads/truck/day
7
Truck type
End dump (25-ton)
Trailer
RGN lowboy
Site contact
Primary location
Saratoga Springs subdivision, lot 22
Jake Hwang
On-site contact
Special instructions
No special instructions.
Material handling
Top-load only. No belly-dump on this material.
Site access
One-lane haul road inside the site — radio dispatch before backing.
Customer requirements
- Preferred drivers: Marcus Hale, Diego Ramos
- Driver must wear Class 2 vest and hardhat at all times