ORD-4238 · Big-D Construction
ORD-4238ActiveNot invoiced
Customer: Big-D ConstructionCreated Jul 8, 2026 by Marisol Vega
Commercial summary
Order terms
Service
Material haul
Material
Topsoil
Est. quantity
116 tons
Window
Jul 12 – Jul 26
Rate
$15.00 per ton
Order value
$1,740.00
Billing
Net 45 · monthly
PO number
PO-77038
Billing contact
—
Pricing breakdown
| Topsoil (116 tons × $15.00) | $1,740.00 |
| Total | $1,740.00 |
Operational details
Route
Pickup
Harper Excavating yard, West Valley
8 mi one-way
Drop-off
Saratoga Springs subdivision, lot 22
Route preview
ComplianceSee Compliance tab
0
Blockers
0
Expiring
4
OK
Materials manifest filed with UDEQDOT pre-trip on fileSite-specific safety orientation
Resources
Trucks
4
Loads/truck/day
6
Truck type
Lowboy trailer
Trailer
Belly-dump
Site contact
Primary location
Saratoga Springs subdivision, lot 22
Sara Beltran
On-site contact
Special instructions
No special instructions.
Material handling
Heaped loads OK. Watch overhead at scale house.
Site access
No idling within 100 ft of office trailers.
Customer requirements
- Driver must wear Class 2 vest and hardhat at all times
- No deliveries before 7:00 am (residential noise ordinance)
- Customer wants ticket photos texted as soon as scaled