ORD-4247 · Whitaker Excavation
ORD-4247ActiveNot invoiced
Customer: Whitaker ExcavationCreated Jun 17, 2026 by Marisol Vega
Commercial summary
Order terms
Service
Demo haul-off
Material
Concrete rubble
Est. quantity
13 loads
Window
Jun 22 – Jul 1
Rate
$320.00 per load
Order value
$4,160.00
Billing
Net 45 · monthly
PO number
—
Billing contact
—
Pricing breakdown
| Concrete rubble (13 loads × $320.00) | $4,160.00 |
| Total | $4,160.00 |
Operational details
Route
Pickup
Kilgore quarry, Salt Lake City
33 mi one-way
Drop-off
Vineyard town center pad
Route preview
ComplianceSee Compliance tab
0
Blockers
0
Expiring
4
OK
Materials manifest filed with UDEQDOT pre-trip on fileSite-specific safety orientation
Resources
Trucks
5
Loads/truck/day
7
Truck type
Belly dump (40-ton)
Trailer
RGN lowboy
Site contact
Primary location
Vineyard town center pad
Jake Hwang
On-site contact
Special instructions
No special instructions.
Material handling
Tarp required leaving pit; DOT spot checks active on I-15.
Site access
Park on west pad for staging. Foreman directs to dump location.
Customer requirements
- Driver must wear Class 2 vest and hardhat at all times
- No deliveries before 7:00 am (residential noise ordinance)
- Customer wants ticket photos texted as soon as scaled