ORD-4204 · Layton Construction

ORD-4204ActiveNot invoiced
Customer: Layton ConstructionCreated Jun 24, 2026 by Jordan Reyes

Commercial summary

Order terms
Service
Material haul
Material
Sand
Est. quantity
12 loads
Window
Jun 26Jul 4
Rate
$260.00 per load
Order value
$3,245.00
Billing
Net 30 · per job
PO number
PO-77004
Billing contact
Karen Wu, AP Manager
Pricing breakdown
Sand (12 loads × $260.00)$3,120.00
Environmental fee$125.00
Total$3,245.00

Operational details

Route
Pickup
Asphalt plant, North Salt Lake
36 mi one-way
Drop-off
Daybreak phase 4, South Jordan
Route preview
ComplianceSee Compliance tab
0
Blockers
0
Expiring
4
OK
Materials manifest filed with UDEQDOT pre-trip on file
Resources
Trucks
2
Loads/truck/day
4
Truck type
Super-10 dump
Trailer
Side-dump trailer
Site contact
Primary location
Daybreak phase 4, South Jordan
Rich Calloway
On-site contact
(801) 555-0142
Special instructions

Call foreman Rich on arrival each day. Gate code 4827.

Material handling

Keep loads under 25 tons due to bridge posting on SR-92.

Site access

Wash rack at exit is mandatory before re-entering public road.

Customer requirements
  • Preferred drivers: Marcus Hale, Diego Ramos
  • Driver must wear Class 2 vest and hardhat at all times