ORD-4205 · Okland Construction

ORD-4205ActiveNot invoiced
Customer: Okland ConstructionCreated Jul 5, 2026 by Marisol Vega

Commercial summary

Order terms
Service
Demo haul-off
Material
Concrete rubble
Est. quantity
13 loads
Window
Jul 8Jul 17
Rate
$320.00 per load
Order value
$4,160.00
Billing
Net 45 · monthly
PO number
Billing contact
Pricing breakdown
Concrete rubble (13 loads × $320.00)$4,160.00
Total$4,160.00

Operational details

Route
Pickup
Geneva Rock pit, Point of the Mountain
43 mi one-way
Drop-off
Vineyard town center pad
Route preview
ComplianceSee Compliance tab
0
Blockers
0
Expiring
4
OK
Materials manifest filed with UDEQDOT pre-trip on fileSite-specific safety orientation
Resources
Trucks
3
Loads/truck/day
5
Truck type
Side dump (40-ton)
Trailer
End-dump
Site contact
Primary location
Vineyard town center pad
Mike Donnelly
On-site contact
(801) 555-0188
Special instructions

No special instructions.

Material handling

Material is wet — load light to stay under 80,000 lb gross.

Site access

Enter from south gate only. Gate code 4827.

Customer requirements
  • Driver must wear Class 2 vest and hardhat at all times
  • No deliveries before 7:00 am (residential noise ordinance)
  • Customer wants ticket photos texted as soon as scaled